BERITA & PENGUMUMAN
Tarikh Kemaskini: 30 Jun 2023
|
No |
Description |
Unit |
|
1 |
Name of Scheme |
- |
Sinarut |
2 |
Year Completed |
- |
1987 |
3 |
Project Function |
- |
Irrigation |
4 |
Capital Cost |
RM |
610,000.00 |
5 |
Brief Description of Scheme |
- |
|
6 |
Project Area |
Ha |
202 |
7 |
Average Annual Rainfall |
mm |
NA |
8 |
Soil Type |
- |
Peat |
9 |
Number of Household |
- |
|
10 |
Average Family Size |
- |
|
11 |
Estimated Population |
- |
|
12 |
Average Holding size |
Ha |
|
13 |
Main Season |
Month |
October - March |
14 |
Off Season |
Month |
April - December |
15 |
Yield for Main Season |
t/ha |
|
16 |
Yield for Off Season |
t/ha |
|
17 |
Cropping Intensity for Main Season |
% |
|
18 |
Cropping Intensity for Off Season |
% |
|
19 |
Planting method |
- |
|
20 |
Mechanisation: Land Preparation |
% |
|
21 | Mechanisation: Harvesting | % | |
22 | Paddy Variety Planted | - | |
23 | Water Source | - | Sg. Liwagu |
24 | Irrigation method | - | Gravity |
a | Total number of pumps in Main Station | nos | none |
b | Capacity per pump | l/sec | none |
25 | Irrigation Area | Ha | 202 |
26 | Earth canal Length | m | - |
27 | Lined canal Length | m | 7110 |
28 | Drain Length | m | 2150 |
29 | Farm Road Length | m | |
30 | Pipe Length | m | 1600 |
31 | Canal Density | m/ha | 45.8 |
32 | Drain Density | m/ha | 10.6 |
33 | Farm Road Density | m/ha | |
34 | Pipe Density | m/ha | 7.9 |
35 | Structure Details | | |
| a. Foot Bridge | nos | 8 |
| b. Tractor Bridge | nos | 10 |
| c. Junction Box | nos | 0 |
| d. Headwork | nos | 1 |
| e. Offtake | nos | 7 |
| f. Drop Structure (ICD) | nos | 47 |
| g. End Control | nos | 7 |
| h. Irrigation control Structure | nos | |
| i. Syphone | nos | |
| j. Road culvert / Drainage culvert | nos | |
| k. Pipe flume/Chute/Pipe Drop | nos | |
36 | Average O&M cost/annum | RM | NA |
|