Jumaat. 29 Mac 2024 - 01:14:50 PM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Buanog

2

Year Completed

-

1971

3

Project Function

-

Irrigation

4

Capital Cost

RM

16,800.00

5

Brief Description of Scheme

-

This scheme is situated in the northern tip of Sabah (Lat 6°44'00"N Long 116°43'45"E) . It covers an area of 30 Ha. Water from Sg. Paku is diverted to the padi fields by a concrete headwork. At the moment only single cropping is being practised by the farmers.

6

Project Area

Ha

30

7

Average Annual Rainfall

mm

na

8

Soil Type

-

Alluvium

9

Number of Household

-

19

10

Average Family Size

-

na

11

Estimated Population

-

na

12

Average Holding size

Ha

1.5

13

Main Season

Month

October - April 

14

Off Season

Month

No planting 

15

Yield for Main Season

t/ha

3.2

16

Yield for Off Season

t/ha

0

17

Cropping Intensity for Main Season

%

na

18

Cropping Intensity for Off Season

%

0

19

Planting method

-

Transplanting

20

Mechanisation: Land Preparation

%

na

21

Mechanisation: Harvesting

%

na

22

Paddy Variety Planted

-

Bahagia, Malinja, Jaya

23

Water Source

-

Sg. Dampirit

24

Irrigation method

-

Gravity

a

Total number of pumps in Main Station

nos

none

b

Capacity per pump

l/sec

 

25

Irrigation Area

Ha

30

26

Earth canal Length

m

1650

27

Lined canal Length

m

nil

28

Drain Length

m

nil

29

Farm Road Length

m

nil

30

Pipe Length

m

nil

31

Canal Density

m/ha

55

32

Drain Density

m/ha

nil

33

Farm Road Density

m/ha

nil

34

Pipe Density

m/ha

nil

35

Structure Details

 

 

 

a. Foot Bridge

nos

3

 

b. Tractor Bridge

nos

0

 

c. Junction Box

nos

nil

 

d. Headwork

nos

1

 

e. Offtake

nos

0

 

f. Drop Structure (ICD)

nos

2

 

g. End Control

nos

1

 

h. Irrigation control Structure

nos

4

 

i. Syphone

nos

1

 

j. Road culvert / Drainage culvert

nos

0

 

k. Pipe flume/Chute/Pipe Drop

nos

1/0/0

36

Average O&M cost/annum

RM

9,000.00

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray