Jumaat. 29 Mac 2024 - 06:53:46 AM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Bingkor Irrigation Scheme

2

Year Completed

-

1963

3

Project Function

-

Irrigation

4

Capital Cost

RM

1,700,000

5

Brief Description of Scheme

-

The project which is under DUN N.25 Bingkor was built in 1963 is approximately 10km from Keningau town. The project covers a potential area of apbout 1,500 ha. The source of water is from Sg. Bayayo and is fed by gravity to the fields. Double cropping is being practised by the farmers.

6

Project Area

Ha

1500

7

Average Annual Rainfall

mm

154.6

8

Soil Type

-

Clay

9

Number of Household

-

na

10

Average Family Size

-

na

11

Estimated Population

-

na

12

Average Holding size

Ha

2

13

Main Season

Month

na 

14

Off Season

Month

na

15

Yield for Main Season

t/ha

4

16

Yield for Off Season

t/ha

3.5

17

Cropping Intensity for Main Season

%

95

18

Cropping Intensity for Off Season

%

70

19

Planting method

-

Transplanting

20

Mechanisation: Land Preparation

%

98

21

Mechanisation: Harvesting

%

na

22

Paddy Variety Planted

-

MR159

23

Water Source

-

Sg. Bayayo

24

Irrigation method

-

Gravity

a

Total number of pumps in Main Station

nos

none

b

Capacity per pump

l/sec

 

25

Irrigation Area

Ha

1500

26

Earth canal Length

m

14055

27

Lined canal Length

m

10496

28

Drain Length

m

na

29

Farm Road Length

m

22495

30

Pipe Length

m

nil

31

Canal Density

m/ha

16.4

32

Drain Density

m/ha

nil

33

Farm Road Density

m/ha

15

34

Pipe Density

m/ha

nil

35

Structure Details

 

 

 

a. Foot Bridge

nos

6

 

b. Tractor Bridge

nos

19

 

c. Junction Box

nos

nil

 

d. Headwork

nos

1

 

e. Offtake

nos

4

 

f. Drop Structure (ICD)

nos

74

 

g. End Control

nos

4

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

36

Average O&M cost/annum

RM

67,000.00

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray