Jumaat. 19 April 2024 - 05:20:32 PM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Trusan Sapi

2

Year Completed

-

1977

3

Project Function

-

Irrigation

4

Capital Cost

RM

NA

5

Brief Description of Scheme

-

This scheme is located along the east bank of Sg. Trusan Sapi within the district of Beluran about 200 km west of Sandakan. It covers a total area of 4,000 ha of land, of this 520 ha has been developed. The present area is targeted for developing some 1,265 ha of land.

6

Project Area

Ha

Phase I=520 ha; Phase II=3363.3 ha

7

Average Annual Rainfall

mm

3192.7

8

Soil Type

-

Cleysol

9

Number of Household

-

95

10

Average Family Size

-

5

11

Estimated Population

-

 

12

Average Holding size

Ha

1.4

13

Main Season

Month

 

14

Off Season

Month

 

15

Yield for Main Season

mt/ha

1.96

16

Yield for Off Season

mt/ha

2.01

17

Cropping Intensity for Main Season

%

NA

18

Cropping Intensity for Off Season

%

NA

19

Planting method

-

Broadcast

20

Mechanisation: Land Preparation

%

100

21

Mechanisation: Harvesting

%

100

22

Paddy Variety Planted

-

MR159, MR219, Taiwan

23

Water Source

-

Sg. Trusan Sapi

24

Irrigation method

-

Pump

a

Total number of pumps in Main Station

nos

5

b

Capacity per pump

l/sec

990

25

Irrigation Area

Ha

 

26

Earth canal Length

m

0

27

Lined canal Length

m

25406

28

Drain Length

m

13160

29

Farm Road Length

m

34533

30

Pipe Length

m

0

31

Canal Density

m/ha

6.35

32

Drain Density

m/ha

3.29

33

Farm Road Density

m/ha

8.63

34

Pipe Density

m/ha

0

35

Structure Details

 

 

 

a. Foot Bridge

nos

3

 

b. Tractor Bridge

nos

35

 

c. Junction Box

nos

 

 

d. Headwork

nos

 

 

e. Offtake

nos

 

 

f. Drop Structure (ICD)

nos

 

 

g. End Control

nos

 

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

 

l. Tidal Gate

nos

 

36

Average O&M cost/annum

RM

 

 

 

 

 

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray