Khamis. 28 Mac 2024 - 08:59:24 PM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Kota Marudu

2

Year Completed

-

1985

3

Project Function

-

Irrigation

4

Capital Cost

RM

2.96 million

5

Brief Description of Scheme

-

This scheme is situated in the West Coast of Sabah in the district of Kota Marudu. This scheme covers an area of 1,215 Ha. Water from the Bandau River is fed by gravity to the fields. Double cropping is widely practiced by farmers.

6

Project Area

Ha

1215

7

Average Annual Rainfall

mm

2180

8

Soil Type

-

Sandy loam

9

Number of Household

-

690

10

Average Family Size

-

5

11

Estimated Population

-

3450

12

Average Holding size

Ha

1.76

13

Main Season

Month

January - May

14

Off Season

Month

July - November

15

Yield for Main Season

mt/ha

4.7

16

Yield for Off Season

mt/ha

3.9

17

Cropping Intensity for Main Season

%

100

18

Cropping Intensity for Off Season

%

100

19

Planting method

-

Broadcast

20

Mechanisation: Land Preparation

%

100

21

Mechanisation: Harvesting

%

100

22

Paddy Variety Planted

-

MR159

23

Water Source

-

Sg. Bandau

24

Irrigation method

-

Gravity

a

Total number of pumps in Main Station

nos

-

b

Capacity per pump

l/sec

-

25

Irrigation Area

Ha

750

26

Earth canal Length

m

6140

27

Lined canal Length

m

10422

28

Drain Length

m

3320

29

Farm Road Length

m

3372

30

Pipe Length

m

-

31

Canal Density

m/ha

22.1

32

Drain Density

m/ha

4.4

33

Farm Road Density

m/ha

4.5

34

Pipe Density

m/ha

-

35

Structure Details

 

 

 

a. Foot Bridge

nos

7

 

b. Tractor Bridge

nos

25

 

c. Junction Box

nos

-

 

d. Headwork

nos

1

 

e. Offtake

nos

5

 

f. Drop Structure (ICD)

nos

19

 

g. End Control

nos

5

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

 

l. Tidal Gate

nos

 

36

Average O&M cost/annum

RM

53,000.00

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray