BERITA & PENGUMUMAN
Tarikh Kemaskini: 30 Jun 2023
|
No
|
Description
|
Unit
|
|
1
|
Name of Scheme
|
-
|
Burung
|
2
|
Year Completed
|
-
|
2001
|
3
|
Project Function
|
-
|
Drainage
|
4
|
Capital Cost
|
RM
|
4,538,420.00
|
5
|
Brief Description of Scheme
|
-
|
The Drainage project, which is situated on the southeast corner of Sabah, 50 km from Tawau town. About 2000 Ha gross area is involved and this project is to rehabilitate swampy area and also to increase oil palm area. The main components of this project is the provision of drains and farm roads. The project which commenced in 1996 (RM7) was completed in 2001 (RM8) and will continue in RM9.
|
6
|
Project Area
|
Ha
|
2000
|
7
|
Average Annual Rainfall
|
mm
|
na
|
8
|
Soil Type
|
-
|
Yellowish Clay Silt
|
9
|
Number of Household
|
-
|
150
|
10
|
Average Family Size
|
-
|
4
|
11
|
Estimated Population
|
-
|
600
|
12
|
Average Holding size
|
Ha
|
6
|
13
|
Main Season
|
Month
|
|
14
|
Off Season
|
Month
|
|
15
|
Yield for Main Season
|
t/ha
|
na
|
16
|
Yield for Off Season
|
t/ha
|
na
|
17
|
Cropping Intensity for Main Season
|
%
|
na
|
18
|
Cropping Intensity for Off Season
|
%
|
|
19
|
Planting method
|
-
|
|
20
|
Mechanisation: Land Preparation
|
%
|
|
21
|
Mechanisation: Harvesting
|
%
|
|
22
|
Paddy Variety Planted
|
-
|
|
23
|
Water Source
|
-
|
|
24
|
Irrigation method
|
-
|
|
a
|
Total number of pumps in Main Station
|
nos
|
|
b
|
Capacity per pump
|
l/sec
|
|
25
|
Irrigation Area
|
Ha
|
|
26
|
Earth canal Length
|
m
|
|
27
|
Lined canal Length
|
m
|
|
28
|
Drain Length
|
m
|
31128
|
29
|
Farm Road Length
|
m
|
15564
|
30
|
Pipe Length
|
m
|
|
31
|
Canal Density
|
m/ha
|
|
32
|
Drain Density
|
m/ha
|
15.6
|
33
|
Farm Road Density
|
m/ha
|
7.8
|
34
|
Pipe Density
|
m/ha
|
|
35
|
Structure Details
|
|
|
|
a. Foot Bridge
|
nos
|
|
|
b. Tractor Bridge
|
nos
|
|
|
c. Junction Box
|
nos
|
|
|
d. Headwork
|
nos
|
|
|
e. Offtake
|
nos
|
|
|
f. Drop Structure (ICD)
|
nos
|
|
|
g. End Control
|
nos
|
|
|
h. Irrigation control Structure
|
nos
|
|
|
i. Syphone
|
nos
|
|
|
j. Road culvert / Drainage culvert
|
nos
|
|
|
k. Pipe flume/Chute/Pipe Drop
|
nos
|
|
36
|
Average O&M cost/annum
|
RM
|
na
|
|