No

Description

Unit

 

1

Name of Scheme

-

Burung

2

Year Completed

-

2001

3

Project Function

-

Drainage

4

Capital Cost

RM

4,538,420.00

5

Brief Description of Scheme

-

The Drainage project, which is situated on the southeast corner of Sabah, 50 km from Tawau town. About 2000 Ha gross area is involved and this project is to rehabilitate swampy area and also to increase oil palm area. The main components of this project is the provision of drains and farm roads. The project which commenced in 1996 (RM7) was completed in 2001 (RM8) and will continue in RM9.

6

Project Area

Ha

2000

7

Average Annual Rainfall

mm

na

8

Soil Type

-

Yellowish Clay Silt

9

Number of Household

-

150

10

Average Family Size

-

4

11

Estimated Population

-

600

12

Average Holding size

Ha

6

13

Main Season

Month

 

14

Off Season

Month

 

15

Yield for Main Season

t/ha

na

16

Yield for Off Season

t/ha

na

17

Cropping Intensity for Main Season

%

na

18

Cropping Intensity for Off Season

%

 

19

Planting method

-

 

20

Mechanisation: Land Preparation

%

 

21

Mechanisation: Harvesting

%

 

22

Paddy Variety Planted

-

 

23

Water Source

-

 

24

Irrigation method

-

 

a

Total number of pumps in Main Station

nos

 

b

Capacity per pump

l/sec

 

25

Irrigation Area

Ha

 

26

Earth canal Length

m

 

27

Lined canal Length

m

 

28

Drain Length

m

31128

29

Farm Road Length

m

15564

30

Pipe Length

m

 

31

Canal Density

m/ha

 

32

Drain Density

m/ha

15.6

33

Farm Road Density

m/ha

7.8

34

Pipe Density

m/ha

 

35

Structure Details

 

 

 

a. Foot Bridge

nos

 

 

b. Tractor Bridge

nos

 

 

c. Junction Box

nos

 

 

d. Headwork

nos

 

 

e. Offtake

nos

 

 

f. Drop Structure (ICD)

nos

 

 

g. End Control

nos

 

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

36

Average O&M cost/annum

RM

na

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray