Selasa. 23 April 2024 - 06:19:16 PM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Lingkungan Irrigation Scheme

2

Year Completed

-

1985

3

Project Function

-

Irrigation

4

Capital Cost

RM

330,728.00

5

Brief Description of Scheme

-

This scheme is situated in the West Coast of Sabah in the district of Beaufort, about 20 km from Beaufort town and 110 km from Kota Kinabalu. This scheme covers an area of 80 Ha. Water from the Lingkungan River is pumped to the fields. Double cropping is not practiced by farmers.

6

Project Area

Ha

80

7

Average Annual Rainfall

mm

NA

8

Soil Type

-

NA

9

Number of Household

-

40

10

Average Family Size

-

6

11

Estimated Population

-

600

12

Average Holding size

Ha

NA

13

Main Season

Month

July - December

14

Off Season

Month

-

15

Yield for Main Season

mt/ha

4

16

Yield for Off Season

mt/ha

-

17

Cropping Intensity for Main Season

%

10

18

Cropping Intensity for Off Season

%

-

19

Planting method

-

Transplanting

20

Mechanisation: Land Preparation

%

0

21

Mechanisation: Harvesting

%

0

22

Paddy Variety Planted

-

TR7

23

Water Source

-

Sg. Lingkungan

24

Irrigation method

-

Pump

a

Total number of pumps in Main Station

nos

3

b

Capacity per pump

l/sec

990

25

Irrigation Area

Ha

80

26

Earth canal Length

m

0

27

Lined canal Length

m

2280

28

Drain Length

m

0

29

Farm Road Length

m

0

30

Pipe Length

m

-

31

Canal Density

m/ha

28.5

32

Drain Density

m/ha

0

33

Farm Road Density

m/ha

0

34

Pipe Density

m/ha

-

35

Structure Details

 

 

 

a. Foot Bridge

nos

 

 

b. Tractor Bridge

nos

 

 

c. Junction Box

nos

 

 

d. Headwork

nos

 

 

e. Offtake

nos

 

 

f. Drop Structure (ICD)

nos

 

 

g. End Control

nos

 

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

 

l. Tidal Gate

nos

 

36

Average O&M cost/annum

RM

 

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray