Khamis. 28 Mac 2024 - 10:22:01 AM
BERITA & PENGUMUMAN

 

~*~*~*~*~*~*

Mesyuarat Ketua-Ketua Cawangan dan Jurutera Daerah Bil.1/2024 dan Bengkel Goal Setting 2024
JPS Sabah
14-17 Januari 2024
Kundasang, Ranau

~*~*~*~*~*~*~

Majlis Pecah Tanah Projek Kerja-Kerja Pertahanan Tebing

Sungai Tuaran di Pekan Tuaran

25 Januari 2024

Tuaran

 

~*~*~*~*~*~*~

 

arkib
MEDIA SOSIAL:
twitter facebook
QR Code Scan
Tarikh Kemaskini: 20 Mar 2024

No

Description

Unit

 

1

Name of Scheme

-

Membakut Irrigation Scheme

2

Year Completed

-

1980

3

Project Function

-

Irrigation

4

Capital Cost

RM

3,709,831.50

5

Brief Description of Scheme

-

This scheme is situated in the West Coast of Sabah in the district of Beaufort, about 20 km from Beaufort town and 70 km from Kota Kinabalu. This scheme covers an area of 1174 Ha. Water from the Membakut River flows by gavity to the fields. Double cropping is practiced by farmers.

6

Project Area

Ha

1174

7

Average Annual Rainfall

mm

NA

8

Soil Type

-

NA

9

Number of Household

-

2000

10

Average Family Size

-

6

11

Estimated Population

-

185920

12

Average Holding size

Ha

NA

13

Main Season

Month

January - June

14

Off Season

Month

July - December

15

Yield for Main Season

mt/ha

4.5

16

Yield for Off Season

mt/ha

3.5

17

Cropping Intensity for Main Season

%

31

18

Cropping Intensity for Off Season

%

19

19

Planting method

-

Broadcast

20

Mechanisation: Land Preparation

%

90

21

Mechanisation: Harvesting

%

80

22

Paddy Variety Planted

-

TR7

23

Water Source

-

Sg. Membakut

24

Irrigation method

-

Gravity

a

Total number of pumps in Main Station

nos

1 Booster Pump

b

Capacity per pump

l/sec

990

25

Irrigation Area

Ha

645

26

Earth canal Length

m

-

27

Lined canal Length

m

18640

28

Drain Length

m

21310

29

Farm Road Length

m

10731

30

Pipe Length

m

-

31

Canal Density

m/ha

28.9

32

Drain Density

m/ha

33

33

Farm Road Density

m/ha

16.6

34

Pipe Density

m/ha

-

35

Structure Details

 

 

 

a. Foot Bridge

nos

14

 

b. Tractor Bridge

nos

18

 

c. Junction Box

nos

 

 

d. Headwork

nos

 

 

e. Offtake

nos

 

 

f. Drop Structure (ICD)

nos

 

 

g. End Control

nos

 

 

h. Irrigation control Structure

nos

 

 

i. Syphone

nos

 

 

j. Road culvert / Drainage culvert

nos

 

 

k. Pipe flume/Chute/Pipe Drop

nos

 

 

l. Tidal Gate

nos

 

36

Average O&M cost/annum

RM

 

 

MSC Malaysia Sabah Government Mampu MY Government 1 Malaysia Jabatan Perdana Menter Pemandu myeg
Dasar Privasi & Keselamatan | Penafian & Syarat Penggunaan
Paparan terbaik menggunakan Mozilla Firefox dengan resolusi skrin 1024x768. Hakcipta Terpelihara © JPS 2011-2024
Disunting oleh Alpha Ray