No
|
Description
|
Unit
|
|
1
|
Name of Scheme
|
-
|
Sindumin Irrigation Scheme
|
2
|
Year Completed
|
-
|
1975
|
3
|
Project Function
|
-
|
Irrigation
|
4
|
Capital Cost
|
RM
|
2,629,380.00
|
5
|
Brief Description of Scheme
|
-
|
This scheme is situated in the West Coast of Sabah in the district of Beaufort, about 15 km from Sipitang town and 145 km from Kota Kinabalu. This scheme covers an area of 607 Ha. Water from the Mengalong River is pumped to the fields. Double cropping is not practiced by farmers.
|
6
|
Project Area
|
Ha
|
607
|
7
|
Average Annual Rainfall
|
mm
|
NA
|
8
|
Soil Type
|
-
|
NA
|
9
|
Number of Household
|
-
|
500
|
10
|
Average Family Size
|
-
|
6
|
11
|
Estimated Population
|
-
|
4000
|
12
|
Average Holding size
|
Ha
|
NA
|
13
|
Main Season
|
Month
|
July - December
|
14
|
Off Season
|
Month
|
-
|
15
|
Yield for Main Season
|
mt/ha
|
3
|
16
|
Yield for Off Season
|
mt/ha
|
-
|
17
|
Cropping Intensity for Main Season
|
%
|
85
|
18
|
Cropping Intensity for Off Season
|
%
|
-
|
19
|
Planting method
|
-
|
Transplanting
|
20
|
Mechanisation: Land Preparation
|
%
|
20
|
21
|
Mechanisation: Harvesting
|
%
|
10
|
22
|
Paddy Variety Planted
|
-
|
NA
|
23
|
Water Source
|
-
|
Sg. Mengalong
|
24
|
Irrigation method
|
-
|
Pump
|
a
|
Total number of pumps in Main Station
|
nos
|
3
|
b
|
Capacity per pump
|
l/sec
|
990
|
25
|
Irrigation Area
|
Ha
|
607
|
26
|
Earth canal Length
|
m
|
10970
|
27
|
Lined canal Length
|
m
|
11880
|
28
|
Drain Length
|
m
|
18100
|
29
|
Farm Road Length
|
m
|
6063
|
30
|
Pipe Length
|
m
|
-
|
31
|
Canal Density
|
m/ha
|
37.6
|
32
|
Drain Density
|
m/ha
|
29.8
|
33
|
Farm Road Density
|
m/ha
|
10
|
34
|
Pipe Density
|
m/ha
|
-
|
35
|
Structure Details
|
|
|
|
a. Foot Bridge
|
nos
|
22
|
|
b. Tractor Bridge
|
nos
|
18
|
|
c. Junction Box
|
nos
|
|
|
d. Headwork
|
nos
|
|
|
e. Offtake
|
nos
|
|
|
f. Drop Structure (ICD)
|
nos
|
|
|
g. End Control
|
nos
|
|
|
h. Irrigation control Structure
|
nos
|
|
|
i. Syphone
|
nos
|
|
|
j. Road culvert / Drainage culvert
|
nos
|
|
|
k. Pipe flume/Chute/Pipe Drop
|
nos
|
|
|
l. Tidal Gate
|
nos
|
|
36
|
Average O&M cost/annum
|
RM
|
|